Ealing/263006CONS
Ealing/263006CONS is a condition discharge data-centre planning application in Ealing at Hayes Bridge Retail Park And Heathrow Interchange Uxbridge Road Hayes, received 2026-07-27; status Undecided.
| Local planning authority | Ealing |
|---|---|
| Address | Hayes Bridge Retail Park And Heathrow Interchange Uxbridge Road Hayes |
| Description | Approval of Reserved Matters (Access, Appearance, Landscaping, Layout and Scale) pursuant to Condition 2 and details pursuant to the partial discharge of Conditions 47 (i) (Contaminated Land), 53 (i) (Public Art) and full discharge of Conditions 48 (Written Scheme of Investigation), 50 (Water Infrastructure Details), 59 (Biodiversity Net Gain), 64 (Generator and Fuel Technology), 65 (Selective Catalytic Reduction), 66 (Generator Operating Regime), 67 (Emission Reduction and Management Plan), 68 (Emissions Monitoring Plan), and 76 (Generator Emission Evidence) of Planning Permission ref. 78343/APP/2025/719, dated 20/05/2026 (Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data entre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (Out of Borough) |
| Type / size | Outline · Small |
| Stage | Condition discharge |
| Status | Undecided |
| Received | 2026-07-27 |
| Decided | — |
| Declared capacity | — |
| Floorspace | — |
| AI / hyperscale flag | no |
| Source | PlanIt record |
Full record — full history back to 2025, status-change events, and facts extracted from the planning documents (MW, floorspace, applicant, cooling, grid connection — each with a verbatim quote and the source PDF) are on the Pro plan. See plans.
Data as of 2026-08-17. JSON: API · More in Ealing